The Project Team is composed of representatives of the various technical disciplines within ADOT, including representatives from the Prescott and Kingman District Offices.

 

 

The purpose of this team is to:

  • Provide ADOT policy and procedural direction
  • Conduct field reconnaissance
  • Provide technical review and approval of the study documents

 

ADOT PROJECT TEAM

Larry Doescher
Project Engineer

ADOT Statewide Project Management Section
205 S. 17th Avenue, Mail Drop 614E
Phoenix, AZ 85007

Ph. (602) 712-7551
FAX (602) 712-7630

Dallas Hammit
District Engineer

ADOT Prescott District
1109 E. Commerce Drive
Prescott, AZ 86305

Ph. (928) 777-5860
FAX (928) 771-0058

Mike Kondelis
District Engineer

ADOT Kingman District
3660 E. Andy Devine
Kingman, AZ 86401

Ph. (928) 681-6020
FAX (928) 757-1269

Paul O'Brien
Predesign Project Manager

ADOT Predesign
205 S. 17th Avenue,  Mail Drop 050P
Phoenix, AZ 85007

Ph. (602) 712-8669
FAX (602) 712-8992

Michael Daehler
NEPA Planner

ADOT Environmental Planning Group
1711  West Jackson
Phoenix, AZ 85007

Ph. (602) 712-6551
FAX (602) 712-3066

Berwyn Wilbrink
Project Manager

Jacobs
875 W. Elliot Rd., Suite 201
Tempe, Arizona  85284

Ph. (480) 763-8609
FAX (480) 763-8601

Laura Nordan, AICP

Environmental Planner

Jacobs
875 W. Elliot Rd., Suite 201
Tempe, Arizona  85284

Ph. (480) 763-8715
FAX (480) 763-8601

This page updated: October 18, 2007.