US 93: Wickenburg to Santa Maria River

Location/Design Concept Study and Environmental Studies

WB01403_.gif (2340 bytes)

Home

SR 89 to Wickenburg Interim Bypass

Wickenburg   (SR 89) to Santa Maria River

Interim Improvement Project

Wickenburg Bypass

Related Studies

Study Team

Feedback

What's New

adot2000.jpg (57245 bytes)

wpe14.jpg (3130 bytes)

Wickenburg (SR 89) to Santa Maria River

Publications

Study Reports

Final Location/Design Concept Report (September 2006) Engineering evaluation of design concept alternatives for the SR 89 to Santa Maria River improvements.

Final Environmental Assessment (March 2005)

Draft Environmental Assessment (September 2004)

Initial Location/Design Concept Report (February 2004) Engineering evaluation of design concept alternatives for the SR 89 to Santa Maria River improvements.

Scoping Report (September 1999) This report compiles all of the information collected during the scoping process.

 

     

This page updated: April 14, 2008.