US 93: Wickenburg to Santa Maria River

Location/Design Concept Study and Environmental Studies

WB01403_.gif (2340 bytes)

Home

SR 89 to Wickenburg Interim Bypass

Wickenburg   (SR 89) to Santa Maria River

Interim Improvement Project

Wickenburg Bypass

Related Studies

Study Team

Feedback

What's New

adot2000.jpg (57245 bytes)

wpe14.jpg (3130 bytes)

Interim Improvement Project

Publications

Study Reports

Preliminary Structure Selection Report - Hassayampa River Bridge (June 2004). Evaluation of structure type, layout, cost, and function for the new Hassayampa River Bridge.

Preliminary Structure Selection Report - Sols Wash Bridge (June 2004). Evaluation of structure type, layout, cost, and function for the new Sols Wash Bridge.

Final Design Concept Report (October 2003). Describes the engineering details of the recommended design concept.

Final Environmental Assessment  (September 2003). This document is an addendum to the Draft EA.

Draft Environmental Assessment (June 2002).  This document summarizes the alternatives development process and assesses the potential social, economic, and environmental impacts associated with the proposed project.

Project Assessment for Alternative 10 (April 2001). This document assesses the requirements to implement Alternative 10.

Feasibility Report (February 2000). This report documents the initial evaluation of the original 13 interim improvement alternatives.

Scoping Report (September 1999) This report compiles all of the information collected during the scoping process.

Newsletters Newsletter #4 (March 2002)

Newsletter #3 (October 2000)

Newsletter #2 (February 2000)

Newsletter #1 (May 1999) 

 

     

This page updated: November 18, 2005.